Investments on "turn key" basis

In cooperation with our long-standing partners (design offices, building services contractors) we carry out investments on the "turn key" basis, as general contractor.

We perform such tasks starting from design, through fabrication (or purchase) and the supply of equipment, installation works  and assembly, to testing, start-up and commissioning.

We have gained experience in the implementation of such projects with the following project, in which we acted as General Contractor:

  • Enlargement of existing line for biomass Ash charging into the boilers K8-K11 (III Line) in ELEKTROWNIA SKAWINA SA (ordered  by Power Plant Skawina SA)
  • Supply, installation and start up of the blue lead flotation machines for  ZGH Bolesław Bukowno
  • Repair of coke boosting station including dedusting  system, electrical installations and lighting in Coke Plant Przyjaźń Dąbrowa Górnicza
  • Slag discharging with dry method – new installation built for Power Plant Skawina SA
  • Building of water treatment plant together with cooling system for MULPIC rolling technology including infrastructure and auxiliary objects for ISD Huta Częstochowa Sp. z o.o.
  • Enlargement of water vapor system from  „Bol-Therm” to Powerplant ”Bolesław” ordered by Bol-Therm Sp. z o.o.